Menu

Aselsan Gölbaşı Campus SSD and Reis Building

Aselsan Gölbaşı Campus SSD and Reis Building

Aselsan Gölbaşı Campus SSD and Reis Building

Aselsan Gölbaşı Campus SSD and Reis Building

Aselsan Gölbaşı Campus SSD and Reis Building

Aselsan Gölbaşı Campus SSD and Reis Building

Aselsan Gölbaşı Campus SSD and Reis Building

Aselsan Gölbaşı Campus SSD and Reis Building

Aselsan Gölbaşı Campus SSD and Reis Building

  • Project Investor: YDA Construction Inc.
  • Project Construction Area: 52633 m2
  • Project Date: 2021
  • Project Duration: 24 Ay
  • Project Details: Ventilation Systems, Heating and Cooling Systems, Plumbing, Fire Systems

Projects

Copyright © All rights reserved. - MEP Design Plumbing Design Construction